The situation
From 31 December 2029, TEN-T ports in the EU must provide shore-side electricity covering at least 90% of calls. A berth that cannot take a vessel's shore power connection is a berth a ship cannot use. The port, the terminal and the contractor building the installation all have the same deadline.