Shore-Side — Shore Power for Ports & Terminals

011

The situation

From 31 December 2029, TEN-T ports in the EU must provide shore-side electricity covering at least 90% of calls. A berth that cannot take a vessel's shore power connection is a berth a ship cannot use. The port, the terminal and the contractor building the installation all have the same deadline.

022

The job

The contractor delivers the shore-side installation: the connection point at the berth, the cable run from the substation, and every component a vessel plugs into — installed, tested and signed off by class.

What we supply for this job

011

Shore Power Plugs & Sockets

the vessel connection point, 690 V to 35 kV.

View product
022

Shore Power Connection Box

LV and HV connection for the berth.

View product
033

HV Shore Power Cable Management System (HVSP-CMS)

6.6–25 kV cable handling for the berth.

View product
044

Spring Driven Cable Reels and Motor Driven Cable Reels

cable handling without manual hauling.

View product
055

Slip Rings & Central Collectors

power, signal and fibre across the rotating joint.

View product
066

Rotary Unions (Rotary Joints)

hydraulic and fluid transfer.

View product
077

Industrial Cables & Hoses

the cable itself, from our own cable plant.

View product

How we work with you

One contract, one interface. Type-approval documents are available on request; certificate files are not posted on the site. Mill Test Certificate EN 10204 3.1 is supplied with every shipment as standard.

Third-party inspection (SGS / BV / TUV / classification society) at your request is accepted and sincerely welcomed. Low-temperature option to −40 °C for high-latitude service — confirm at inquiry.