Solutions

Every project we supply happens in one of two places: on the shore, or on the ship. We are the supplier retrofit contractors, shipyards and EPCs call when the job has to be delivered as one package — certified components, one contract, one interface, one supplier to answer for it.

shore-berth

Shore-Side

Shore-Side — Shore Power for Ports & Terminals

The situation

From 31 December 2029, TEN-T ports in the EU must provide shore-side electricity covering at least 90% of calls. A berth that cannot take a vessel's shore power connection is a berth a ship cannot use. The port, the terminal and the contractor building the installation all have the same deadline.

The job

We are the supplier the retrofit contractor calls when the job has to be delivered as one package: the certified components, one contract, one interface, and one supplier who answers for it.

retrofit

Ship-Side

Ship-Side — Vessel Newbuild & Green Retrofit

The situation

IMO 2020 capped sulphur in fuel. EEXI and CII now grade every ship on its emissions, and there is no hiding from the number. When a vessel docks, the yard has a window — and the window is the package.

The job

We are the supplier the shipyard calls when the work has to be delivered as one package: certified product, one contract, one interface — and a supplier who answers for the whole delivery.

How we work with you

One contract, one interface: one supplier for the certified components, one contact who answers for the package. Type-approval documents are available on request. Certificate files themselves are not posted on this site.

Every shipment leaves with its Mill Test Certificate — EN 10204 3.1 — as standard. Third-party inspection is welcomed — SGS, BV, TÜV, and classification society attendance can be arranged. A low-temperature option to −40 °C is available for cold-climate operation; confirm it at inquiry.